Migration Guide
Create comprehensive migration guides with step-by-step procedures, validation, and rollback strategies
npx claude-code-templates@latest --command documentation/migration-guide Scanned by NVIDIA SkillSpector
Automated static analysis (no LLM) · v2.12.0 · 2026-10-23
Partial analysis: some checks could not run on this component.
SkillSpector looks for patterns such as shell commands, credential access, network calls or unpinned dependencies. An observation is something worth reading in the files before you install, not a confirmed vulnerability. Components that run code locally, like hooks, MCP servers and security tooling, naturally show more of them.
No observations.
Learn more about NVIDIA SkillSpector.
Content
Migration Guide Generator
Create comprehensive migration guide: $ARGUMENTS
Current System Analysis
- Current versions: @package.json or @requirements.txt or detect from lock files
- Migration history: !
find . -name "*migration*" -o -name "*upgrade*" | head -5 - Database schema: !
find . -name "*schema*" -o -name "*.sql" | head -3 - Dependencies: !
grep -c "dependency\|require\|import" package.json requirements.txt 2>/dev/null || echo "0" - Infrastructure: @docker-compose.yml or @k8s/ or @terraform/ (if exists)
Task
Generate systematic migration guide with comprehensive safety measures: $ARGUMENTS
Migration Scope Analysis
- Identify what is being migrated (framework, library, architecture, etc.)
- Determine source and target versions or technologies
- Assess the scale and complexity of the migration
- Identify affected systems and components
Impact Assessment
- Analyze breaking changes between versions
- Identify deprecated features and APIs
- Review new features and capabilities
- Assess compatibility requirements and constraints
- Evaluate performance and security implications
Prerequisites and Requirements
- Document system requirements for the target version
- List required tools and dependencies
- Specify minimum versions and compatibility requirements
- Identify necessary skills and team preparation
- Outline infrastructure and environment needs
Pre-Migration Preparation
- Create comprehensive backup strategies
- Set up development and testing environments
- Document current system state and configurations
- Establish rollback procedures and contingency plans
- Create migration timeline and milestones
Step-by-Step Migration Process
Example for Framework Upgrade:
markdown## Step 1: Environment Setup 1. Update development environment 2. Install new framework version 3. Update build tools and dependencies 4. Configure IDE and tooling ## Step 2: Dependencies Update 1. Update package.json/requirements.txt 2. Resolve dependency conflicts 3. Update related libraries 4. Test compatibility ## Step 3: Code Migration 1. Update import statements 2. Replace deprecated APIs 3. Update configuration files 4. Modify build scriptsBreaking Changes Documentation
- List all breaking changes with examples
- Provide before/after code comparisons
- Explain the rationale behind changes
- Offer alternative approaches for removed features
Example Breaking Change:
markdown### Removed: `oldMethod()` **Before:** ```javascript const result = library.oldMethod(param1, param2);After:
javascriptconst result = library.newMethod({ param1: param1, param2: param2 });Rationale: Improved type safety and extensibility
Configuration Changes
- Document configuration file updates
- Explain new configuration options
- Provide configuration migration scripts
- Show environment-specific configurations
Database Migration (if applicable)
- Create database schema migration scripts
- Document data transformation requirements
- Provide backup and restore procedures
- Test migration with sample data
- Plan for zero-downtime migrations
Testing Strategy
- Update existing tests for new APIs
- Create migration-specific test cases
- Implement integration and E2E tests
- Set up performance and load testing
- Document test scenarios and expected outcomes
Performance Considerations
- Document performance changes and optimizations
- Provide benchmarking guidelines
- Identify potential performance regressions
- Suggest monitoring and alerting updates
- Include memory and resource usage changes
Security Updates
- Document security improvements and changes
- Update authentication and authorization code
- Review and update security configurations
- Update dependency security scanning
- Document new security best practices
Deployment Strategy
- Plan phased rollout approach
- Create deployment scripts and automation
- Set up monitoring and health checks
- Plan for blue-green or canary deployments
- Document rollback procedures
Common Issues and Troubleshooting
markdown## Common Migration Issues ### Issue: Import/Module Resolution Errors **Symptoms:** Cannot resolve module 'old-package' **Solution:** 1. Update import statements to new package names 2. Check package.json for correct dependencies 3. Clear node_modules and reinstall ### Issue: API Method Not Found **Symptoms:** TypeError: oldMethod is not a function **Solution:** Replace with new API as documented in step 3Team Communication and Training
- Create team training materials
- Schedule knowledge sharing sessions
- Document new development workflows
- Update coding standards and guidelines
- Create quick reference guides
Tools and Automation
- Provide migration scripts and utilities
- Create code transformation tools (codemods)
- Set up automated compatibility checks
- Implement CI/CD pipeline updates
- Create validation and verification tools
Timeline and Milestones
markdown## Migration Timeline ### Phase 1: Preparation (Week 1-2) - [ ] Environment setup - [ ] Team training - [ ] Development environment migration ### Phase 2: Development (Week 3-6) - [ ] Core application migration - [ ] Testing and validation - [ ] Performance optimization ### Phase 3: Deployment (Week 7-8) - [ ] Staging deployment - [ ] Production deployment - [ ] Monitoring and supportRisk Mitigation
- Identify potential migration risks
- Create contingency plans for each risk
- Document escalation procedures
- Plan for extended timeline scenarios
- Prepare communication for stakeholders
Post-Migration Tasks
- Clean up deprecated code and configurations
- Update documentation and README files
- Review and optimize new implementation
- Conduct post-migration retrospective
- Plan for future maintenance and updates
Validation and Testing
- Create comprehensive test plans
- Document acceptance criteria
- Set up automated regression testing
- Plan user acceptance testing
- Implement monitoring and alerting
Documentation Updates
- Update API documentation
- Revise development guides
- Update deployment documentation
- Create troubleshooting guides
- Update team onboarding materials
Migration Types and Specific Considerations:
Framework Migration (React 17 → 18):
- Update React and ReactDOM imports
- Replace deprecated lifecycle methods
- Update testing library methods
- Handle concurrent features and Suspense
Database Migration (MySQL → PostgreSQL):
- Convert SQL syntax differences
- Update data types and constraints
- Migrate stored procedures to functions
- Update ORM configurations
Cloud Migration (On-premise → AWS):
- Containerize applications
- Update CI/CD pipelines
- Configure cloud services
- Implement infrastructure as code
Architecture Migration (Monolith → Microservices):
- Identify service boundaries
- Implement inter-service communication
- Set up service discovery
- Plan data consistency strategies
Remember to:
- Test thoroughly in non-production environments first
- Communicate progress and issues regularly
- Document lessons learned for future migrations
- Keep the migration guide updated based on real experiences